Septicground
Get local answers

Septic permit rules and requirements in Texas

In Texas, the state sets the rule. The septic permit comes from your county or city authorized agent. For some systems the state issues it itself. The code is 30 TAC Chapter 285. Texas Health and Safety Code § 366.051 · checked 2026-09-11

Your county or city authorized agent

Issues the permit

checked 2026-09-11

30 TAC Chapter 285

Code section

checked 2026-09-23

Who decides a septic permit in Texas

Your county or city authorized agent issues an ordinary residential permit. For some systems the state issues it itself. The state sets the floor.

The statute lets a county or city become an authorized agent. If a location sits in an authorized agent's area, the agent issues the permit. The state issues it everywhere else.

Texas Health and Safety Code § 366.051 · checked 2026-09-11

The office's phone number is 512-239-3799.

This is the phone number for general septic questions on the contacts page. The page also lists a separate number for licenses and registrations.

Texas Commission on Environmental Quality — On-Site Sewage Facility Program Contacts · checked 2026-09-23

The office publishes its own page on this: Texas Commission on Environmental Quality — On-Site Sewage Facilities (OSSF) Program.

The office's own page names this address as its canonical link.

Texas Commission on Environmental Quality — On-Site Sewage Facilities (OSSF) Program · checked 2026-09-23

The floor state law sets

The rules that govern every septic system in Texas are 30 TAC Chapter 285. Every local permit is issued under them.

It writes the rules for building, permitting and checking septic systems across the state.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

What state law requires

Does Texas require a septic permit?

Texas requires a permit to build, alter, repair, extend or operate an OSSF.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

Does Texas require a percolation test?

Texas requires a site evaluation, not a percolation test, before a permit.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

The minimum septic tank size Texas allows.

1,000 gallons.

Applies to a 3-bedroom house.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

How far a system must sit from a well in Texas.

100 feet.

Applies to a private well, as the state floor. A county may set more.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

How far a system must sit from the property line in Texas.

5 feet.

Applies to a property line, as the state floor. A county may set more.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

Must the installer be licensed in Texas?

TCEQ licenses installers before they can build an OSSF.

Texas Administrative Code, Title 30, Chapter 285 · checked 2026-09-23

Whether Texas counts what it permits

Yes. Texas publishes septic permit counts by county.

Texas Commission on Environmental Quality — Permitting Data for OSSF (Septic Systems) · checked 2026-09-11

Counties with rules of their own

The state writes the code. Each county below adds rules of its own. Open the county to read them with their sources.

County Sets itself
Bastrop County permit required any lot size · sizing factor 180 gpd small structures · professional design second home small tract · installer inspection day notice
Bell County permit required any lot size · no holding tanks new construction
Collin County minimum lot size · licensing required regardless of lot size · inspection interval
Comal County permit fee · floodplain permit required
Denton County permit fee · minimum lot size · culvert permit required · floodplain permit required
Ellis County minimum lot size · homeowner installer license required · final plat annotation
Fort Bend County permit required any lot size · registered installer only · food business monthly service
Grayson County minimum lot size private water · aerobic system small lot · public sewer connection · rv sites aerobic
Guadalupe County permit required any lot size · minimum lot size · pump tank planning materials
Hays County waterway setback 150ft · edwards recharge zone lot size · no acreage exemption
Hunt County minimum lot size · permit required any lot size · holding tanks prohibited · remodel upgrade required
Montgomery County permit fee · no septic in floodway
Parker County permit fee · minimum lot size · no acreage exemption
Travis County permit fee · minimum lot size · no acreage exemption
Williamson County permit fee
Wise County minimum lot size · platting referral

Sources

State records only. Each figure above has a government source and a checked-on date. County figures live on the county pages.

  1. Texas Commission on Environmental Quality — On-Site Sewage Facilities (OSSF) Program · checked 2026-09-23
  2. Texas Commission on Environmental Quality — On-Site Sewage Facility Program Contacts · checked 2026-09-23
  3. Texas Health and Safety Code § 366.051 · checked 2026-09-23
  4. Texas Commission on Environmental Quality — Permitting Data for OSSF (Septic Systems) · checked 2026-09-11

Verify before you act. Septic rules are set locally and they change. Check anything here with your county or city authorized agent before you spend money on it.